FYI-Bridge Demo
Wednesday, August 29, 2018
FYI, MACINTOSH FARMS COMMUNITY
AUGUST 2018, There is a bridge on North MacIntosh Lane between Golden Lane and Winesap Drive which is slated to be demolished in mid-September.
The plan is to install two catch basins to handle the storm run-off and direct it to the culvert under the Golden Lane entrance. The second part of the work involves installing a sidewalk where the bridge is currently. There will obviously be some disruption and inconvenience especially for walkers.
AND
The Board of Directors has a plan from Hydrosphere Engineering and Polaris Surveying to better define the emergency spillways from the retention basins at South MacIntosh. The next step is to meet with the City and gain their approval for the improvements.